<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Planning &#8211; Bush Hill Park Residents&#039; Association</title>
	<atom:link href="https://bhpra.org.uk/category/planning/feed/" rel="self" type="application/rss+xml" />
	<link>https://bhpra.org.uk</link>
	<description>Information for Residents</description>
	<lastBuildDate>Sun, 08 Mar 2026 23:29:52 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>

<image>
	<url>https://bhpra.org.uk/wp-content/uploads/2017/06/cropped-leaf-favicon-1-32x32.png</url>
	<title>Planning &#8211; Bush Hill Park Residents&#039; Association</title>
	<link>https://bhpra.org.uk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Massive development proposed at Southbury leisure centre</title>
		<link>https://bhpra.org.uk/2026/03/08/massive-development-proposed-at-southbury-leisure-centre/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=massive-development-proposed-at-southbury-leisure-centre</link>
		
		<dc:creator><![CDATA[Admin]]></dc:creator>
		<pubDate>Sun, 08 Mar 2026 14:57:19 +0000</pubDate>
				<category><![CDATA[All]]></category>
		<category><![CDATA[Planning]]></category>
		<guid isPermaLink="false">https://bhpra.org.uk/?p=3353</guid>

					<description><![CDATA[The Society is very grateful for a local resident for providing us with these notes. A detailed planning application (25/04330/OUT) is now at public consultation for a major redevelopment of Southbury Leisure Park that would demolish all existing buildings and replace them with a high‑density residential scheme of up to…<p class="continue-reading-button"> <a class="continue-reading-link" href="https://bhpra.org.uk/2026/03/08/massive-development-proposed-at-southbury-leisure-centre/">Continue reading<i class="crycon-right-dir"></i></a></p>]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The Society is very grateful for a local resident for providing us with these notes.</p>



<p class="wp-block-paragraph">A detailed planning application (25/04330/OUT) is now at public consultation for a major redevelopment of Southbury Leisure Park that would demolish all existing buildings and replace them with a high‑density residential scheme of up to 1,150 new <strong>build to rent</strong> flats, delivered across four large plots with a mix of 8 tall towers of 26 storeys, 20 storeys, 18 storeys, 16 storeys, 12 storeys, 9 and 10 storeys, mid‑rise blocks (5 to 6) and ground‑floor commercial units. </p>



<figure class="wp-block-image size-full"><img fetchpriority="high" decoding="async" width="891" height="555" src="https://bhpra.org.uk/wp-content/uploads/2026/03/site-outline.png" alt="" class="wp-image-3357" srcset="https://bhpra.org.uk/wp-content/uploads/2026/03/site-outline.png 891w, https://bhpra.org.uk/wp-content/uploads/2026/03/site-outline-300x187.png 300w, https://bhpra.org.uk/wp-content/uploads/2026/03/site-outline-768x478.png 768w, https://bhpra.org.uk/wp-content/uploads/2026/03/site-outline-150x93.png 150w" sizes="(max-width: 891px) 100vw, 891px" /><figcaption class="wp-element-caption">Site outline. [Source: Design &amp; Access Statement, Part 4]</figcaption></figure>



<p class="wp-block-paragraph">The application is in two parts: the Detailed Part includes 489 Build‑to‑Rent homes, while the Outline Part allows up to 661 more, with the overall masterplan introducing significant height, reconfigured car parking for the school and leisure centre. The development will include 76 general parking spaces with the remainder being disabled spaces.</p>



<p class="wp-block-paragraph">Local residents are extremely unhappy with the proposals.</p>



<p class="has-light-green-cyan-background-color has-background wp-block-paragraph">The closing date for objections is 5pm, Wednesday 18th March. Objections can be lodged on the <a href="https://planningandbuildingcontrol.enfield.gov.uk/online-applications/" target="_blank" rel="noreferrer noopener">planning portal</a> or e-mailed to <a href="mailto:planning.support@enfield.gov.uk">planning.support@enfield.gov.uk</a>. Please quote the planning application number 25/04330/OUT in any correspondence.</p>



<h2 class="wp-block-heading">Proposed views</h2>



<p class="wp-block-paragraph">The application contains 264 documents. Amongst them are documents with computer-generated images showing how the development will appear. Here are two:</p>



<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="650" src="https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-2-1024x650.jpg" alt="" class="wp-image-3356" srcset="https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-2-1024x650.jpg 1024w, https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-2-300x191.jpg 300w, https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-2-768x488.jpg 768w, https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-2-150x95.jpg 150w, https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-2-318x201.jpg 318w, https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-2.jpg 1291w" sizes="(max-width: 1024px) 100vw, 1024px" /><figcaption class="wp-element-caption">View north-west from Morrisons A10. [Source: HEALTH TOWNSCAPE &amp; VISUAL IMPACT ASSESSMENT LR_PART 4]</figcaption></figure>



<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="670" src="https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-1-1024x670.jpg" alt="" class="wp-image-3355" srcset="https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-1-1024x670.jpg 1024w, https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-1-300x196.jpg 300w, https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-1-768x502.jpg 768w, https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-1-150x98.jpg 150w, https://bhpra.org.uk/wp-content/uploads/2026/03/southbury-redev-1.jpg 1312w" sizes="(max-width: 1024px) 100vw, 1024px" /><figcaption class="wp-element-caption">View westwards across A10 junction from Morrisons. [Source: HEALTH TOWNSCAPE &amp; VISUAL IMPACT ASSESSMENT LR_PART 4]</figcaption></figure>



<p class="wp-block-paragraph">The blue outlines in these images are not currently understood. The assumption is that these show the outlines of a previous design which is now not going to be proposed.</p>



<h2 class="wp-block-heading">Detailed grounds for objection </h2>



<h3 class="wp-block-heading">1. <strong>Harm to Neighbourhood Character and Local Context</strong></h3>



<p class="wp-block-paragraph">The proposal is incompatible with the established character of the area.</p>



<ul class="wp-block-list">
<li>The surrounding neighbourhood is defined by low‑rise, low‑density residential development.</li>



<li>The scale and form suggested in the outline documents would introduce a level of massing and intensity that conflicts with <strong>CP4</strong>, <strong>CP5</strong>, and <strong>London Plan Policy D1</strong> on respecting local character.</li>
</ul>



<p class="wp-block-paragraph">The development would erode the suburban character of the area and set a harmful precedent for further intensification irreversibly changing the character of the low rise residential neighbourhood.</p>



<p class="wp-block-paragraph">The development consisting of a 16 storey, 18 storey and 28 storey buildings in both phases is a wholly over-intensification and over-development of the site area proposed for development. The land cannot comfortably accommodate 1,200 build to rent homes.</p>



<h3 class="wp-block-heading">2. <strong>Failure to meet mixed‑tenure policies</strong></h3>



<p class="wp-block-paragraph">The proposal also fails to demonstrate compliance with mixed‑tenure and social integration policies required by the London Plan and Enfield’s own housing strategies. Policy H10 of the London Plan expects developments to deliver genuinely mixed and balanced communities, with tenure types integrated throughout the site and indistinguishable in terms of quality, access, and amenity. The outline submission includes no private homes, no intermediate homes and no affordable homes. It provides no clear tenure strategy, no indication of how affordable homes would be distributed, and no safeguards to prevent segregation or “tenure clustering”. Without this information, the scheme risks creating a fragmented development that undermines social cohesion and contradicts the Council’s stated objectives for inclusive, mixed communities. The absence of a robust tenure plan including private homes, intermediate homes and affordable homes is a significant policy conflict and renders the application premature.</p>



<h3 class="wp-block-heading"><strong>3. Local Highway Constraints</strong></h3>



<p class="wp-block-paragraph">The Transport Assessment acknowledges:</p>



<ul class="wp-block-list">
<li>Multiple <strong>signalised crossings</strong> and guardrails at the Southbury Road frontage</li>



<li>The A10/Southbury Road junction is already heavily congested.</li>



<li>Bus lanes and turning movements are constrained.</li>
</ul>



<p class="wp-block-paragraph">Yet it fails to model the cumulative impact of:</p>



<ul class="wp-block-list">
<li>Construction traffic (which the construction environmental management plan confirms will span <strong>7 years</strong>, 2028–2035) of construction.</li>



<li>Delivery and servicing trips</li>



<li>Overlapping phases, meaning continuous heavy vehicle movements from 2028–2035.</li>



<li>A <strong>7‑year construction programme</strong></li>



<li>Works adjacent to a <strong>secondary school</strong>, a leisure centre, and residential streets</li>
</ul>



<h3 class="wp-block-heading"><strong>4. Noise, Dust and Air Quality</strong></h3>



<p class="wp-block-paragraph">The site lies within an <strong>Air Quality Management Area</strong> for PM10 and NO₂. The CEMP acknowledges this but provides only high‑level mitigation. Given the scale of demolition (including a multi‑storey cinema), the risk of dust and particulate pollution is significant.</p>



<h3 class="wp-block-heading"><strong>5. Insufficient Infrastructure Capacity</strong></h3>



<p class="wp-block-paragraph">There is no assessment of the impact on local services, including:</p>



<ul class="wp-block-list">
<li>GP surgeries</li>



<li>Schools</li>



<li>Public transport</li>



<li>Utilities and drainage</li>
</ul>



<p class="wp-block-paragraph">Local infrastructure is already under strain. The development would adversely impact local infrastructure.</p>



<h3 class="wp-block-heading"><strong>6. Deficiencies in Public Consultation</strong></h3>



<p class="wp-block-paragraph">Residents have experienced significant difficulty in awareness of the proposed development. No consultation letters, pre-application or post-application have been received from either the developer or the Local Planning Authority in a number of roads local to the proposed site.</p>



<h3 class="wp-block-heading"><strong>7. Scale, Height, Massing and Density</strong></h3>



<p class="wp-block-paragraph">The proposed redevelopment of Southbury Leisure Park represents an <strong>excessive and unjustified intensification</strong> of the site, with scale, height, massing and density far beyond what is appropriate for its context, contrary to both adopted and emerging planning policy. The Design &amp; Access Statement itself demonstrates multiple conflicts with the surrounding character, local constraints, and the Draft Local Plan Site Allocation SA2.4.</p>



<h3 class="wp-block-heading"><strong>8. Excessive Height and Tall Building Concentration</strong></h3>



<p class="wp-block-paragraph">The scheme introduces <strong>multiple towers (8)</strong>, including a “Landmark Tower” at the A10/Southbury Road junction and <strong>5/6</strong> additional buildings across Plots A–D:-</p>



<p class="wp-block-paragraph">1 x 26 storey tower<br>1 x 20 storey tower<br>1 x 18 storey tower<br>1 x 16 storey tower<br>1 x 12 storey tower<br>2 x 10 storey tower<br>5/6 x 3 to 5 storey towers</p>



<p class="wp-block-paragraph"><strong>Total No. buildings: 13-15</strong></p>



<p class="wp-block-paragraph">These heights:</p>



<ul class="wp-block-list">
<li><strong>Far exceed</strong> the indicative expectations of the Draft Site Allocation, which anticipates <em>some</em> height at the junction but not a cluster of towers.</li>



<li>Create a <strong>city-centre-style cluster</strong> in an area characterised by 2–3 storey residential streets (Bryn‑y‑Mawr Road, Sketty Road, Jules Thorn Avenue, Southbury Avenue, Clive Road, Bertram Road, Percival Road.</li>
</ul>



<h3 class="wp-block-heading"><strong>9. Overdevelopment and Excessive Density</strong></h3>



<p class="wp-block-paragraph">The hybrid application proposes:</p>



<ul class="wp-block-list">
<li>489 units (Detailed Part) Plots A and B</li>



<li>Up to 661 units (Outline Part) Plots C and D</li>



<li><strong>Total: up to 1,150 units</strong></li>
</ul>



<p class="wp-block-paragraph">This represents a <strong>dramatic intensification</strong> of a 2.95ha site, equating to a density far above typical suburban PTAL 2–3 locations. The scheme’s density is incompatible with The surrounding low-rise suburban grain, Limited transport capacity, Existing pressure on local schools, healthcare, and road networks, The constrained nature of Southbury Road and the A10 junction.</p>



<h3 class="wp-block-heading"><strong>10. Harmful Massing and Poor Transition to Residential Area</strong></h3>



<p class="wp-block-paragraph">The massing strategy creates abrupt and harmful transitions: 9–12 storey “villa blocks” and 20+ storey towers sit <strong>immediately adjacent</strong> to <strong>2-storey homes</strong>.</p>



<ul class="wp-block-list">
<li>The proposed buildings will greatly overshadow, overbear existing properties with loss of light impact, and loss of privacy. The local streets will be overwhelmed by the <strong>sheer bulk</strong> of the proposed buildings.</li>



<li>The scheme would dominate views from, Enfield Playing Fields, Southbury Road, Residential streets to the west, The approach to Southbury Station</li>
</ul>



<p class="wp-block-paragraph">The visuals show a <strong>dramatically altered skyline</strong> that is out of character with the area.</p>



<h3 class="wp-block-heading"><strong>11. The buildings are far too tall for this neighbourhood</strong></h3>



<p class="wp-block-paragraph">The plans include several tall buildings and a “landmark tower” at the A10 junction. These would be completely out of scale with the surrounding streets, where most homes are only two storeys high. Instead of one taller building at the corner, the scheme creates a <strong>cluster of towers</strong>, which would dominate the skyline and overshadow nearby homes, gardens, and public spaces.</p>



<h3 class="wp-block-heading"><strong>12. The overall development is extremely dense</strong></h3>



<p class="wp-block-paragraph">Up to <strong>1,150 flats</strong> are proposed on a site that currently has none. This is almost <strong>double</strong> the number suggested in the council’s own draft plans for the area. For a location with limited public transport and already busy roads, this level of density is simply too much.</p>



<h3 class="wp-block-heading"><strong>13. The massing feels overwhelming</strong></h3>



<p class="wp-block-paragraph">Large blocks of 9–12 storeys are placed very close to existing houses on Bryn‑y‑Mawr Road, Sketty Road and Jules Thorn Avenue. The step-down in height is minimal, meaning many residents would face:</p>



<ul class="wp-block-list">
<li>Loss of daylight</li>



<li>Loss of privacy</li>



<li>A sense of being overshadowed or enclosed</li>
</ul>



<p class="wp-block-paragraph">The scale and bulk of the buildings would change the character of the area completely.</p>



<h3 class="wp-block-heading"><strong>14. Local infrastructure cannot support this level of growth</strong></h3>



<p class="wp-block-paragraph">With over a thousand new homes, the pressure on:</p>



<ul class="wp-block-list">
<li>Schools</li>



<li>GP surgeries</li>



<li>Roads</li>



<li>Public transport</li>
</ul>



<p class="wp-block-paragraph">would be significant. The documents do not show how these impacts would be managed or mitigated.</p>



<h3 class="wp-block-heading"><strong>15. The character of Southbury would be lost</strong></h3>



<p class="wp-block-paragraph">Instead of complementing the surrounding community, the scheme introduces a city-centre scale of development into a suburban area. The height, density and massing would fundamentally alter the look and feel of Southbury, Bush Hill Park and the surrounding neighbourhoods.</p>



<h2 class="wp-block-heading"><strong>Conclusion</strong></h2>



<p class="wp-block-paragraph">The proposed scale, height, massing and density are <strong>inappropriate, excessive, and unjustified</strong>, resulting in:</p>



<ul class="wp-block-list">
<li>Overdevelopment of a constrained suburban site</li>



<li>Harm to residential amenity</li>



<li>A discordant and intrusive skyline</li>



<li>Failure to respect local character</li>



<li>Insufficient infrastructure capacity</li>



<li>Poor transition to surrounding homes</li>
</ul>



<p class="wp-block-paragraph">For these reasons, the proposal should be <strong>refused</strong> on grounds of excessive height, massing, density, and failure to respond appropriately to local context and policy.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Petition for full Council debate on Local Plan</title>
		<link>https://bhpra.org.uk/2022/06/11/petition-for-full-council-debate-on-local-plan/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=petition-for-full-council-debate-on-local-plan</link>
		
		<dc:creator><![CDATA[Admin]]></dc:creator>
		<pubDate>Sat, 11 Jun 2022 13:36:29 +0000</pubDate>
				<category><![CDATA[All]]></category>
		<category><![CDATA[Planning]]></category>
		<guid isPermaLink="false">https://bhpra.org.uk/?p=2733</guid>

					<description><![CDATA[A number of local Community Action groups, including The Enfield Society have started a petition demanding time for a debate at full Council on the Local Plan. Following the local elections in May 2022, 29 new councillors have been elected who have had no prior involvement with the process. This…<p class="continue-reading-button"> <a class="continue-reading-link" href="https://bhpra.org.uk/2022/06/11/petition-for-full-council-debate-on-local-plan/">Continue reading<i class="crycon-right-dir"></i></a></p>]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">A number of local Community Action groups, including The Enfield Society have started <a href="https://governance.enfield.gov.uk/mgEpetitionListDisplay.aspx?bcr=1">a petition demanding time for a debate at full Council on the Local Plan</a>. </p>



<figure class="wp-block-image size-full"><img decoding="async" src="https://bhpra.org.uk/wp-content/uploads/2022/07/petition-link-1.jpg" alt="" class="wp-image-2743"/></figure>



<p class="wp-block-paragraph">Following the local elections in May 2022, 29 new councillors have been elected who have had no prior involvement with the process. This represents 46% of the total number of councillors.</p>



<p class="wp-block-paragraph">The petition calls on the Council to:</p>



<ol class="wp-block-list"><li>Bring the revised Local Plan to a Full Council meeting, as promised by a majority vote of councillors at an <a rel="noreferrer noopener" href="https://governance.enfield.gov.uk/ieListDocuments.aspx?CId=108&amp;MId=13694&amp;Ver=4" target="_blank">Extraordinary Council Meeting held on 9th June 2021</a>. <a href="https://governance.enfield.gov.uk/mgAi.aspx?ID=51157" target="_blank" rel="noreferrer noopener">See also the minutes for this discussion</a>.</li><li>Allow sufficient time for councillors to debate the merits of the Local Plan for the first, and only, time at Full Council before it is submitted to the National Planning Inspectorate for consultation as part of the Regulation 19 process.</li><li>Ensure that each councillor has the chance to vote either for or against the plan and, in the interest of transparency and public accountability, subject this vote to a “Roll Call” so that there is a public record of how each councillor voted.</li><li>Publish the revised Local Plan, in fully accessible form for residents (length, format, physical copies) at least 12 weeks before the date of the proposed Full Council meeting to enable councillors, especially those who are new, to properly consider the contents of the plan and to engage their constituents in a meaningful and productive consultation about their aspirations, their homes and their environment before the debate at Full Council at which councillors can decide whether to submit the plan to the National Inspectorate and proceed to a formal public consultation.</li></ol>



<p class="wp-block-paragraph">You must be a resident, work or study in the London Borough of Enfield to be eligible to add your name to the petition. A total of 3,124 signatures are needed in order for the Council to consider the petition. Registration on the Council website is not needed to sign a petition.</p>



<p class="wp-block-paragraph"><strong>Following failures with the Council&#8217;s Petition website, this petition has now been extended to 31st August 2022.</strong></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Enfield&#8217;s Local Plan</title>
		<link>https://bhpra.org.uk/2021/07/03/enfields-local-plan/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=enfields-local-plan</link>
		
		<dc:creator><![CDATA[Admin]]></dc:creator>
		<pubDate>Sat, 03 Jul 2021 09:31:10 +0000</pubDate>
				<category><![CDATA[All]]></category>
		<category><![CDATA[Consultations]]></category>
		<category><![CDATA[News]]></category>
		<category><![CDATA[Planning]]></category>
		<guid isPermaLink="false">http://bhpra.org.uk/?p=2568</guid>

					<description><![CDATA[A Special Council meeting on 8th June approved a draft new Local Plan which will be used as the blue-print for the development of the Borough up until 2039. The plan is now in a 12-week period of consultation which ends on Monday 13th September. This is a controversial document…<p class="continue-reading-button"> <a class="continue-reading-link" href="https://bhpra.org.uk/2021/07/03/enfields-local-plan/">Continue reading<i class="crycon-right-dir"></i></a></p>]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">A Special Council meeting on 8th June approved a draft new Local Plan which will be used as the blue-print for the development of the Borough up until 2039. The plan is now in a 12-week period of consultation which <strong>ends on Monday 13th September</strong>.</p>



<p class="wp-block-paragraph">This is a controversial document as it proposes to build on Green Belt land, mainly in the north west part of the Borough. The full plan can be <a rel="noreferrer noopener" href="https://new.enfield.gov.uk/services/planning/draft-new-local-plan/" target="_blank">downloaded from the Council web-site</a>. Health Warning: its a big document (15MB and 413 pages) and the download is very slow.</p>



<p class="wp-block-paragraph">Contained in the plan are proposals to develop, or re-develop, many brown-field sites including supermarkets and low-rise retail areas. Tall buildings (defined by the Mayor of London as over 21m (7 floors)) are also envisaged throughout the Borough and the Plan <a rel="noreferrer noopener" href="/docs/localplan/figure-7.4.pdf" target="_blank">shows the proposed maximum heights in different locations</a> (Figure 7.4).</p>



<p class="wp-block-paragraph">Some of the more controversial proposals include:</p>



<ul class="wp-block-list"><li>building up to 3,000 homes at Crews Hill. The land for this will include the golf course and Green Belt farm land between the nurseries and the M25</li><li>building a new housing estate (dubbed Chase Park) on land north and south of Enfield Road / Slades Hill (Vicarage Farm). Campaigning groups have already seen very <a rel="noreferrer noopener" href="https://enfieldsociety.org.uk/2021/05/18/plans-revealed-for-5000-homes-on-vicarage-farm-enfield-road/" target="_blank">detailed proposals by Comer Homes</a> for this where a substantially higher number of houses is proposed (5,000)</li><li>large expansion of land for Spurs to the north of Whitewebbs Lane</li><li>the re-development of a number of local supermarkets including Sainsbury&#8217;s Winchmore Hill, Morrisons A10, Sainsbury&#8217;s A10 and Tesco&#8217;s Ponders End</li><li>&#8216;conversion&#8217; of the recreation fields at Firs Farm and to the east of the A10 (south of Church Street) for crematorium use</li><li>permitted tall building in many locations of the Borough including at Enfield Town station (up to 51m, 17 storeys)</li></ul>



<p class="wp-block-paragraph">There are more details about some of these proposals on the <a href="https://enfieldsociety.org.uk/localplan" target="_blank" rel="noreferrer noopener">Enfield Society&#8217;s web-site</a>.</p>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="689" src="https://bhpra.org.uk/wp-content/uploads/2021/07/local-plan-building-map-1-1024x689.jpg" alt="" class="wp-image-2570" srcset="https://bhpra.org.uk/wp-content/uploads/2021/07/local-plan-building-map-1-1024x689.jpg 1024w, https://bhpra.org.uk/wp-content/uploads/2021/07/local-plan-building-map-1-300x202.jpg 300w, https://bhpra.org.uk/wp-content/uploads/2021/07/local-plan-building-map-1-768x517.jpg 768w, https://bhpra.org.uk/wp-content/uploads/2021/07/local-plan-building-map-1-150x101.jpg 150w, https://bhpra.org.uk/wp-content/uploads/2021/07/local-plan-building-map-1.jpg 1194w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /><figcaption>Map showing controversial areas for development in the Borough, some with housing. Base map is (C)OpenStreetMap and its contributors</figcaption></figure>



<h2 class="wp-block-heading">How to respond</h2>



<p class="wp-block-paragraph">The Council has provided three ways to respond: by email to <a href="mailto:localplan@enfield.gov.uk">localplan@enfield.gov.uk</a>, by post, or via a web survey form at the separate <a rel="noreferrer noopener" href="https://letstalk.enfield.gov.uk/localplan" target="_blank">‘Let’s Talk’ webpage</a>. This latter involves a ‘bespoke consultation platform’ but in reality it just hosts a survey that includes the same 72 questions as in the draft Local Plan document itself (albeit with different numbers). This is unnecessarily complicated and responses do not need to complete the survey.</p>



<p class="wp-block-paragraph">The easiest way to respond to the consultation is to email <a href="mailto:localplan@enfield.gov.uk">localplan@enfield.gov.uk</a> with the words ‘draft Local Plan’ in the title. If you wish to object to a particular part of the Plan, it is important that you state which specific part of the Plan you object to and why. You should cite the relevant paragraph, page, and figure numbers, and where possible the policy references. To help you we have included the references in the bullet point list above.</p>



<p class="has-white-color has-vivid-green-cyan-background-color has-text-color has-background wp-block-paragraph">It is also important that you include your name and full postal address in any response. LBE has in the past dis-regarded respondents who have failed to provide this.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Proposal to build 8 flats on the tennis courts in Abbey Road</title>
		<link>https://bhpra.org.uk/2021/03/13/proposal-to-build-8-flats-on-the-tennis-courts-in-abbey-road/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=proposal-to-build-8-flats-on-the-tennis-courts-in-abbey-road</link>
		
		<dc:creator><![CDATA[Admin]]></dc:creator>
		<pubDate>Sat, 13 Mar 2021 14:55:38 +0000</pubDate>
				<category><![CDATA[All]]></category>
		<category><![CDATA[Planning]]></category>
		<guid isPermaLink="false">http://bhpra.org.uk/?p=2535</guid>

					<description><![CDATA[New plans to build two blocks of flats in the heart of the Bush Hill Park Conservation Area have been submitted to Enfield Council by developers DDDDDD Ltd (honest, that&#8217;s the name!) on land currently owned by Bush Hill Park Bowls and Tennis Club. The plot earmarked for development runs…<p class="continue-reading-button"> <a class="continue-reading-link" href="https://bhpra.org.uk/2021/03/13/proposal-to-build-8-flats-on-the-tennis-courts-in-abbey-road/">Continue reading<i class="crycon-right-dir"></i></a></p>]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">New plans to build two blocks of flats in the heart of the Bush Hill Park Conservation Area have been submitted to Enfield Council by developers DDDDDD Ltd (honest, that&#8217;s the name!) on land currently owned by Bush Hill Park Bowls and Tennis Club. The plot earmarked for development runs along Abbey Road and has been used as tennis courts for the best part of a century.</p>



<p class="wp-block-paragraph"><em>Abbey Road Residents and Neighbours</em>, an action group set up last year to oppose the development, was successful in halting the original plans to build nine flats. Two, separate, reports prepared by Enfield’s planning department advised the developer and the Club that their plans to build flats would harm the BHP Conservation Area. Both reports make it clear that a development of two sets of semi-detached houses (ie four dwellings) would be more in keeping with the character of the road.</p>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="283" src="https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-front-elevation-1024x283.png" alt="" class="wp-image-2537" srcset="https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-front-elevation-1024x283.png 1024w, https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-front-elevation-300x83.png 300w, https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-front-elevation-768x213.png 768w, https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-front-elevation-1536x425.png 1536w, https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-front-elevation-2048x567.png 2048w, https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-front-elevation-150x42.png 150w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /><figcaption>Latest plans for the development in Abbey Road, front elevation. Although the buildings look like houses they are blocks of flats. [From the Planning Application.]</figcaption></figure>



<p class="wp-block-paragraph">At first glance the latest plans, published on the Enfield planning portal last month, resemble four semi-detached houses. But they are not single-occupancy houses. The plans submitted are to build <em><strong>eight flats</strong></em>. A local architect described the new plans ‘a wolf in sheep’s clothing’. If approved it will be seen by ever-eager developers to cash in and build more flats ‘disguised’ as semi-detached houses in Conservation Areas, destroying the character and heritage of our neighbourhood.</p>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="444" src="https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-side-elevation-1024x444.png" alt="" class="wp-image-2538" srcset="https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-side-elevation-1024x444.png 1024w, https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-side-elevation-300x130.png 300w, https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-side-elevation-768x333.png 768w, https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-side-elevation-150x65.png 150w, https://bhpra.org.uk/wp-content/uploads/2021/03/abbey-road-side-elevation.png 1372w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /><figcaption>From the side the size of the buildings becomes apparent. [Image from the Planning Application.]</figcaption></figure>



<p class="wp-block-paragraph">None of the existing houses in Abbey Road have been converted into flats, reflecting the strict planning policy guidelines adopted by Enfield Council when considering applications to convert single dwellings into flats in Conservation Areas. Enfield’s Development Management Document states: ‘The protection of the existing character of a locality is a particularly important issue in the case of Conservation Areas. For this reason there will be a general presumption against the conversion of single dwellings into flats in Conservation Areas’.</p>



<p class="wp-block-paragraph">Bush Hill Park Bowls and Tennis Club have said publicly they expect to make around £1m from the sale of the tennis club land. Their Board minutes reveal the Club’s intention to purchase one of the flats on a buy-to-let basis to cover future costs of employing bar staff at their clubhouse. To date there has been a lack of transparency from the Club on how it will use the remaining cash windfall from their deal with developers. Residents in Abbey Road and Wellington Road, whose houses back onto the Club’s grounds, are concerned the remaining cash from the development could result in further, disruptive, building work such as a scheme to build an indoor bowls facility.</p>



<p class="wp-block-paragraph">Residents are lobbying hard, with the support of our local councillors, to ensure the latest plans are thrown out. A second round of neighbourhood public consultation on the plans was launched on 11 March. Residents can submit views on the new plans using the Enfield Council planning register: <a href="https://planningandbuildingcontrol.enfield.gov.uk/online-applications/">https://planningandbuildingcontrol.enfield.gov.uk/online-applications/</a>. Type in “Abbey Road” to find the application. The application number is <strong>20/01895/FUL. </strong>Confusingly it is still showing as 9 flats on the Planning Portal, which was the first planning application. Comments can be e-mailed directly to the Senior Officer assigned to this application, Alex Johnson, by e-mail to <a href="mailto:alex.johnson@enfield.gov.uk">alex.johnson@enfield.gov.uk</a> <strong>Closing date to submit comments is 25 March</strong>.</p>



<p class="wp-block-paragraph">To find out more about how you can support our campaign, contact the Abbey Road Residents and Neighbours group by e-mail: <a href="mailto:ARRN2021@gmail.com">ARRN2021@gmail.com</a></p>



<p class="wp-block-paragraph"><em>This article was prepared by the Abbey Road Residents and Neighbours Group and was published by the BHPRA in its Spring 2021 newsletter. The BHPRA is grateful for the contribution.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Colosseum Retail Park: what the local papers are reporting</title>
		<link>https://bhpra.org.uk/2020/10/01/colosseum-retail-park-what-the-local-papers-are-reporting/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=colosseum-retail-park-what-the-local-papers-are-reporting</link>
		
		<dc:creator><![CDATA[Admin]]></dc:creator>
		<pubDate>Thu, 01 Oct 2020 13:59:19 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[Planning]]></category>
		<guid isPermaLink="false">http://bhpra.org.uk/?p=2476</guid>

					<description><![CDATA[The Planning Application to re-develop B&#38;Q, Buzz Bingo and the associated car parks was approved at LBE&#8217;s Planning Committee held on Tuesday 29th September. A tied vote meant that the Planning Committee Chair, Cllr Sinas Boztas, used his casting vote to approve the scheme. Reports have now been published by…<p class="continue-reading-button"> <a class="continue-reading-link" href="https://bhpra.org.uk/2020/10/01/colosseum-retail-park-what-the-local-papers-are-reporting/">Continue reading<i class="crycon-right-dir"></i></a></p>]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The Planning Application to re-develop B&amp;Q, Buzz Bingo and the associated car parks was approved at LBE&#8217;s Planning Committee held on Tuesday 29th September.  A tied vote meant that the Planning Committee Chair, Cllr Sinas Boztas, used his casting vote to approve the scheme.</p>



<p class="wp-block-paragraph">Reports have now been published by <a href="https://www.enfieldindependent.co.uk/news/18759445.29-storey-tower-block-enfield-retail-park-approved/" target="_blank" rel="noreferrer noopener">The Enfield Independent</a> and <a href="https://enfielddispatch.co.uk/tallest-tower-in-enfield-given-go-ahead" target="_blank" rel="noreferrer noopener">The Enfield Dispatch</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Phone mast: Planning Permission refused</title>
		<link>https://bhpra.org.uk/2020/06/12/phone-mast-planning-permission-refused/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=phone-mast-planning-permission-refused</link>
		
		<dc:creator><![CDATA[Admin]]></dc:creator>
		<pubDate>Fri, 12 Jun 2020 14:47:50 +0000</pubDate>
				<category><![CDATA[All]]></category>
		<category><![CDATA[Planning]]></category>
		<guid isPermaLink="false">http://bhpra.org.uk/?p=2425</guid>

					<description><![CDATA[The proposed phone mast on the corner of Park Avenue and Queen Anne&#8217;s Place has been refused by Enfield&#8217;s Panning Department, citing two main reasons: excessive height and insufficient arboricultural evidence; The proposed telecommunications monopole and associated equipment, due to its excessive height, scale, design and siting would result in…<p class="continue-reading-button"> <a class="continue-reading-link" href="https://bhpra.org.uk/2020/06/12/phone-mast-planning-permission-refused/">Continue reading<i class="crycon-right-dir"></i></a></p>]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The proposed phone mast on the corner of Park Avenue and Queen Anne&#8217;s Place has been refused by Enfield&#8217;s Panning Department, citing two main reasons: excessive height and insufficient arboricultural evidence;</p>



<ol class="wp-block-list"><li>The proposed telecommunications monopole and associated equipment, due to its excessive height, scale, design and siting would result in a significantly prominent and incongruous feature that would result in demonstrable harm to the visual amenity and character and appearance of Bush Hill Park Conservation Area. The proposal fails to preserve and enhance the character and appearance of the Bush Hill Park Conservation Area. The harm caused cannot be justified in terms of any public benefit that could potentially be delivered by the proposal. Furthermore, the proposal will not enhance or better reveal the significance of the heritage asset but act to diminish its significance. The proposal would therefore be contrary to the NPPF, NPPG, Policies CP30 and CP31 of the Core Strategy (2010), Policies DMD37 and DMD44 of the Development Management Document (2014), and the Bull Hill Park Conservation Area Character Appraisal (2015).</li><li>Insufficient arboricultural evidence has been provided, in the form of BS 5837:2012 and current National Joint Utilities Group guidance, to demonstrate that there would be no undue harm caused to trees in the Conservation Area by the proposed development, which involves the mast, cabinets and subterranean cable ducting. The trees are prominent and offer high valuable amenity within the Bush Hill Park Conservation Area and the irrevocable damage to these trees caused by the development is unjustifiable and would not be acceptable. The proposal would therefore be contrary to the NPPF, NPPG, London Plan policies 7.8, 7.19 and 7.21, Core Strategy policy CP31, CP34 and DMD44 and DMD 80 of the Development Management Document (2014).</li></ol>



<p class="wp-block-paragraph">We expect the application to go to appeal, and similar cases elsewhere in the Borough have been granted at appeal stage&#8230;</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>BHPRA adds its voice to the objections to the Coloseum Retail Park development</title>
		<link>https://bhpra.org.uk/2020/05/24/bhpra-adds-its-voice-to-objections-to-the-coloseum-retail-park-development/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=bhpra-adds-its-voice-to-objections-to-the-coloseum-retail-park-development</link>
		
		<dc:creator><![CDATA[Admin]]></dc:creator>
		<pubDate>Sun, 24 May 2020 18:01:45 +0000</pubDate>
				<category><![CDATA[All]]></category>
		<category><![CDATA[News]]></category>
		<category><![CDATA[Planning]]></category>
		<guid isPermaLink="false">http://bhpra.org.uk/?p=2393</guid>

					<description><![CDATA[The BHPRA has submitted a formal objection to aspects of the proposed Coloseum Retail Park development. The BHPRA believes that the major issue with this development is one that affects all “High Rise” building within the London Borough of Enfield, that is, there is no coherent policy regarding tall buildings.…<p class="continue-reading-button"> <a class="continue-reading-link" href="https://bhpra.org.uk/2020/05/24/bhpra-adds-its-voice-to-objections-to-the-coloseum-retail-park-development/">Continue reading<i class="crycon-right-dir"></i></a></p>]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The BHPRA has submitted a formal objection to aspects of the proposed Coloseum Retail Park development.</p>



<p class="wp-block-paragraph">The BHPRA believes that the major issue with this development is one that affects all “High Rise” building within the London Borough of Enfield, that is, there is no coherent policy regarding tall buildings. This allows developers “carte blanche” to quote precedent of development.</p>



<ul class="wp-block-list"><li>The B&amp;Q site is ostensibly a “shed type” development from the 1980s</li><li>As such we would agree that this a “brown field” site which would significantly benefit from a well-planned residential development</li><li>What has clearly been learnt from the &#8220;lock down&#8221; is the need for <em>Gentle Density</em>. People are looking for space and greenery, not high rise. Where this does not take place, it is clearly reflected in mental health</li><li>The proposed development goes against this, which is surprising as the Alma Road redevelopment moves away from the brutal 1970s to a much more considered development, which considers the wishes of residents</li><li>The Grenfell Tower catastrophe showed that Emergency Services cannot deal with fires over a certain height, so we are again surprised that large monolithic buildings are being considered</li><li>One major issue is public transport links. Residents will have little car parking space so will be reliant on Transport Public links. Southbury is the nearest Station, on the Hertford to Liverpool Street line, with Enfield Town and Bush Hill Park being a twenty-minute walk away.</li><li>The problem with both lines is that if there is a reliable service, it is just not frequent.</li><li>There are still issues around infrastructure, particularly schools, health provision and a mix of shops</li></ul>



<p class="wp-block-paragraph">The BHPRA notes that several other Community Groups, including The Enfield Society, Enfield Town Centre Residents Association and the Enfield Over 50s Forum have all expressed similar concerns. Our Group supports them and urges the Council to reject the application.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Objections to proposed new mobile phone mast</title>
		<link>https://bhpra.org.uk/2020/05/10/objections-to-proposed-new-mobile-phone-mast/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=objections-to-proposed-new-mobile-phone-mast</link>
		
		<dc:creator><![CDATA[Admin]]></dc:creator>
		<pubDate>Sun, 10 May 2020 18:45:24 +0000</pubDate>
				<category><![CDATA[Consultations]]></category>
		<category><![CDATA[News]]></category>
		<category><![CDATA[Planning]]></category>
		<guid isPermaLink="false">http://bhpra.org.uk/?p=2368</guid>

					<description><![CDATA[Three major organisations have lodged objections to the proposed phone mast in addition to numerous individuals. The deadline for submitting an objection is Monday 11th May. The Enfield Society, the Bush Hill Park Conservation Advisory Group and the BHPRA have all submitted objections, saying that the site is not appropriate…<p class="continue-reading-button"> <a class="continue-reading-link" href="https://bhpra.org.uk/2020/05/10/objections-to-proposed-new-mobile-phone-mast/">Continue reading<i class="crycon-right-dir"></i></a></p>]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Three major organisations have lodged objections to the <a href="https://bhpra.org.uk/2020/04/21/20m-mobile-phone-mast-near-bhp-station/">proposed phone mast</a> in addition to numerous individuals.  The deadline for submitting an objection is <strong>Monday 11th May</strong>.</p>



<p class="wp-block-paragraph">The Enfield Society, the Bush Hill Park Conservation Advisory Group and the BHPRA have all submitted objections, saying that the site is not appropriate for the area.</p>



<p class="wp-block-paragraph">Other locations have been suggested, notably near the footbridge which crosses the line between Abbey Road and East Crescent/Lincoln Crescent.</p>



<p class="wp-block-paragraph">We await the Council&#8217;s response.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>20m mobile phone mast near BHP station?</title>
		<link>https://bhpra.org.uk/2020/04/21/20m-mobile-phone-mast-near-bhp-station/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=20m-mobile-phone-mast-near-bhp-station</link>
					<comments>https://bhpra.org.uk/2020/04/21/20m-mobile-phone-mast-near-bhp-station/#comments</comments>
		
		<dc:creator><![CDATA[Admin]]></dc:creator>
		<pubDate>Tue, 21 Apr 2020 19:59:40 +0000</pubDate>
				<category><![CDATA[All]]></category>
		<category><![CDATA[Planning]]></category>
		<guid isPermaLink="false">http://bhpra.org.uk/?p=2315</guid>

					<description><![CDATA[Proposed Base Station installation, CTIL_15081921, Junction of First Avenue and Queen Anne’s Place, Enfield, EN1 2QX Planning Application Number 20/01162/PAT We need to draw your attention to a planning application, lodged with Enfield Council, for the erection of a 20m (66 feet) high telephone mast. The mast will be located…<p class="continue-reading-button"> <a class="continue-reading-link" href="https://bhpra.org.uk/2020/04/21/20m-mobile-phone-mast-near-bhp-station/">Continue reading<i class="crycon-right-dir"></i></a></p>]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><strong>Proposed Base Station installation, CTIL_15081921, Junction of First Avenue and Queen Anne’s Place, Enfield, EN1 2QX</strong></p>



<p class="wp-block-paragraph"><strong>Planning Application Number 20/01162/PAT</strong></p>



<p class="wp-block-paragraph">We need to draw your attention to a planning application, lodged with Enfield Council, for the erection of a 20m (66 feet) high telephone mast. The mast will be located in the unspoilt greensward on the corner of First Avenue and Queen Annes Place (opposite Bagshot Road). The mast will have two dishes, above the tree line, along with three unsightly cabinets at street level.</p>



<p class="wp-block-paragraph">The applicant has tried to screen the installation in the tree line. However, in their own words, 25% of the mast will be above the tree line (including dishes) to be signal effective.</p>



<p class="wp-block-paragraph">Whilst most of us use mobile ‘phones we believe the benefits of this installation are far outweighed by the intrusion in the conservation area. This proposal is an industrial sized response located in an inappropriate and charming part of our area. Our views are that the mast’s siting, location, and ugly appearance is detrimental to the unique atmosphere of the Bush Hill Park Conservation area.</p>



<p class="wp-block-paragraph">If you agree may we urge as many residents as possible to write, in the strongest possible terms listing their objections. <strong>These can only be on siting, location and appearance (not health)</strong>.</p>



<p class="wp-block-paragraph">Apart from Bush Hill Park Residents Association, Bush Hill Park Conservation Study Group and The Enfield Society will or have registered objections.</p>



<p class="wp-block-paragraph"><strong>Please forward your objections to </strong><a href="mailto:planning.decisions@enfield.gov.uk"><strong>planning.decisions@enfield.gov.uk</strong></a><strong> before 11</strong><sup><strong>th</strong></sup><strong> May.</strong></p>
]]></content:encoded>
					
					<wfw:commentRss>https://bhpra.org.uk/2020/04/21/20m-mobile-phone-mast-near-bhp-station/feed/</wfw:commentRss>
			<slash:comments>1</slash:comments>
		
		
			</item>
		<item>
		<title>Plan to use 5th Southgate Scouts ground yet again</title>
		<link>https://bhpra.org.uk/2019/04/26/plan-to-use-5th-southgate-scouts-ground-yet-again/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=plan-to-use-5th-southgate-scouts-ground-yet-again</link>
		
		<dc:creator><![CDATA[Admin]]></dc:creator>
		<pubDate>Fri, 26 Apr 2019 17:28:42 +0000</pubDate>
				<category><![CDATA[All]]></category>
		<category><![CDATA[Planning]]></category>
		<guid isPermaLink="false">http://bhpra.org.uk/?p=1810</guid>

					<description><![CDATA[The 5th Southgate Scouts were shocked to discover that a second planning application has been submitted to use their sports field. [Their field is adjacent to the New River in Fords Grove.] This one has minor changes, including toilets, which apparently the children will be able to use! Scout leader…<p class="continue-reading-button"> <a class="continue-reading-link" href="https://bhpra.org.uk/2019/04/26/plan-to-use-5th-southgate-scouts-ground-yet-again/">Continue reading<i class="crycon-right-dir"></i></a></p>]]></description>
										<content:encoded><![CDATA[<p>The 5th Southgate Scouts were shocked to discover that a second planning application has been submitted to use their sports field. [Their field is adjacent to the New River in Fords Grove.] This one has minor changes, including toilets, which apparently the children will be able to use!</p>
<p>Scout leader Jayne Poole has asked if once again for help from local residents, to lodge objections, to reiterate to the planning department that this is community open space, not vacant land; which is used by scores of children.</p>
<p>You may <a href="https://planningandbuildingcontrol.enfield.gov.uk/online-applications/applicationDetails.do?keyVal=PPMTV2JNLPX00&amp;activeTab=summary" target="_blank" rel="noopener">object to the planning application</a> on-line.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
